Worked examples

Four-Phase Signal Timing — Worked Example with Protected Lefts

By Michael Flynn, PE · water resources & dam safety engineer ·

An arterial crossing with protected left-turn phases on both streets, a 3% downgrade on the main approach and 72-ft crosswalks. We set the change and clearance intervals, check pedestrian time, pick the cycle with Webster's formula, split the green by critical flow ratio, and check v/c and delay for every phase.

The intersection

Approach85th-percentile speed 40 mi/h, main approach on a 3% downgrade, intersection width 72 ft, vehicle length 20 ft
DriversPerception–reaction t = 1.0 s, deceleration a = 10 ft/s²
Pedestrians72-ft crosswalks, 3.5 ft/s walking speed, 7-s walk
PhasingFour phases in sequence, 4 s lost time each
PhaseMovementCritical lane flow v (veh/h)Saturation flow s (veh/h/ln)
1NB/SB protected left1801,750
2NB/SB through5601,800
3EB/WB protected left1401,750
4EB/WB through4001,800

Signal timing tool: speed 40, grade −3, W 72, crosswalk 72, and the four phase rows above.

Open the signal timing calculator →
Step 1 · Change and clearance

Yellow and all-red

v = 40 × 1.467 = 58.7 ft/s
Y = 1.0 + 58.7 / (2 × 10 + 2 × 32.2 × (−0.03)) = 1.0 + 58.7/18.07 = 4.25 s  (level ground: 3.93 s)
AR = (72 + 20)/58.7 = 1.57 s
Change interval per phase Y + AR = 5.82 s (field timing commonly rounded up to 4.5 + 2.0 s)
Step 2 · Pedestrians

Minimum time for the crosswalks

Pedestrian clearance = 72/3.5 = 20.6 s  →  walk + clearance = 7 + 20.6 = 27.6 s
Step 3 · Critical flow ratios and cycle length

Webster and the HCM minimum

y = 180/1,750 = 0.103  ·  560/1,800 = 0.311  ·  140/1,750 = 0.080  ·  400/1,800 = 0.222  →  ΣY = 0.716
L = 4 × 4 = 16 s
Co = (1.5 × 16 + 5)/(1 − 0.716) = 29/0.284 = 102.2 s → use C = 105 s
Cmin (Xc = 0.90) = 16 × 0.90/(0.90 − 0.716) = 78.3 s
Step 4 · Green splits

Allocate C − L = 89 s by critical flow ratio

PhaseyEffective g (s)Displayed G (s)Capacity (veh/h/ln)v/cUniform delay d1 (s/veh)
1 NB/SB left0.10312.811.02130.84545.1
2 NB/SB through0.31138.736.86630.84530.4
3 EB/WB left0.0809.98.11660.84546.8
4 EB/WB through0.22227.625.84730.84536.7
gi = (yi/0.716) × 89  ·  G = g − Y − AR + tL = g − 4.25 − 1.57 + 4
Xc = ΣY × C/(C − L) = 0.716 × 105/89 = 0.845 — equal for every critical lane group by construction
Volume-weighted uniform delay = Σv·d1/Σv = 36.2 s/veh
Step 5 · Checks

Pedestrians and minimum greens

Phase 2 (peds cross the minor street): 36.8 + 5.8 = 42.6 s ≥ 27.6 s ✓
Phase 4 (peds cross the major street): 25.8 + 5.8 = 31.6 s ≥ 27.6 s ✓
Phase 3 left: 8.1 s displayed green — above a 5–7 s minimum, but short; consider a lead-lag or permitted+protected left if queues spill back
The calculator's pedestrian flag is phase-blind. It warns whenever any phase is shorter than walk + clearance, including the left-turn phases, which carry no pedestrians. Read the flag against your actual ped phasing.
Why not a longer or shorter cycle? Uniform delay alone keeps rising with cycle length: 28.8 s/veh at 80 s, 36.2 at 105 s, 40.7 at 120 s and 49.8 at 150 s. Shorter cycles push Xc toward 1 (0.895 at 80 s), where random and overflow delay — not included in d1 — grow sharply and queues stop clearing. Webster's Co balances the two.

Tools used in this example

Signal timing calculator, traffic flow and PHF, and Stopbar to simulate the result. Guide: How to time a traffic signal.

Frequently asked questions

How does grade affect the yellow interval?

The ITE formula divides approach speed by 2a + 2gG. On a downgrade G is negative, so the denominator shrinks and yellow gets longer: at 40 mi/h it rises from 3.93 s on level ground to 4.25 s on a 3% downgrade.

How many phases count toward lost time?

Every phase in the critical path of the ring. With four sequential phases and 4 s of lost time each, L = 16 s. Lost time is why adding a protected left-turn phase is expensive: it raises Webster's cycle by about 1.5 × 4 / (1 − ΣY) seconds even before its own green.

Do pedestrians need time in every phase?

Only in the phases that run concurrently with a crosswalk, usually the through phases. Here pedestrians cross with phases 2 and 4, which provide 42.6 s and 31.6 s of green plus change interval against the 27.6 s needed.

What level of service does the delay correspond to?

HCM signalized intersection LOS thresholds on control delay are 10, 20, 35, 55 and 80 s/veh for A through E. The volume-weighted uniform delay here is about 36 s, so LOS D before random and oversaturation delay are added.

Get future worked examples in your inbox

One real design problem per month, with the math worked out and the gotchas called out. Free.

Free. Unsubscribe anytime. Privacy.