All tools Print with PE stamp box Designed for sealed engineering submittals — print drops PE stamp + signature block at the end.

Lift Station Wet Well Sizing

Required wet-well storage volume between pump-on and pump-off elevations. Limits motor cycling to protect pump life while keeping detention time short enough to avoid septicity. Single-pump and lead-lag-pump configurations.

gpm (each pump)
gpm
minutes (between starts; 6–10 typical)
gallons
ft
min
min

Defaults: 200 gpm per pump, 100 gpm peak inflow, 6-min minimum cycle. Δh column is for a 3-ft-diameter wet well as a reference; scale by area for other sizes.

Single pump, between pump-on and pump-off:
$$ V = \frac{Q_p \, t_c}{4} $$
Duplex, alternating lead/lag (each pump's cycle):
$$ V = \frac{(Q_p - Q_{in}) \, Q_{in}}{Q_p} \cdot t_c $$
V wet well operating volume (between low and high level alarms) · Qp pump capacity · Qin peak inflow · tc minimum cycle time (limit of motor starts/hour).

Why a minimum cycle time matters

Motor cycling — the on/off sequence — is the dominant cause of pump-station maintenance. Most submersible sewage pumps in the 5 to 50 hp range are limited to 6 to 10 starts per hour by the manufacturer (Goulds, Flygt, Wilo). More starts than that and the rotor heating during locked-rotor inrush exceeds the cool-down between cycles. Eventually the windings fail.

For a single pump, the worst case is when inflow exactly equals half the pump capacity — pump runs as long as it sits idle, maximum cycles per hour. The single-pump formula V = Qp tc / 4 is derived from this worst-case inflow.

Septicity — the upper bound on V

Sewage held in a wet well goes anaerobic in 30 to 60 minutes at warm temperatures. H₂S production starts immediately, generating odor complaints and corroding the concrete above the waterline. Operating volumes giving HRT > 30 min at average flow are red flags. The fix: pick a smaller pump (cycles more often) and accept lower cycle time, or add aeration.

Duplex (lead/lag) — preferred design

Duplex stations alternate between two equal pumps with each cycle. Effective cycles per pump are halved, so the minimum-volume formula gives smaller V. Both pumps fire together in peak-inflow override conditions. Standard EPA / 10 States Standards require duplex for any station handling raw sewage; triplex (three pumps) for stations where one pump can't handle peak inflow.

Wet well diameter and depth

Wet wells are usually 4 to 8 ft (1.2 to 2.4 m) diameter precast concrete manholes for small stations. Operating depth (between low-level cutoff and high-level alarm) is typically 2 to 4 ft (0.6 to 1.2 m). Total wet well depth includes:

Reference: Sanks, R.L. (2008). Pumping Station Design, 3rd ed., Butterworth-Heinemann, ch. 12. Great Lakes — Upper Mississippi River Board (2014). Recommended Standards for Wastewater Facilities ("10 States Standards").

Related tools

Monthly engineering case studies

One real stormwater or hydraulics design problem per month, with the math worked out and the gotchas called out. No tutorials, no fluff.

Free. Unsubscribe anytime. Privacy.

Engineer of Record — Stamp & Signature
APPLY PE STAMP HERE
Engineer Name
License No.
State
Signature
Date
Project / Sheet
By stamping and signing, the Engineer of Record certifies that the inputs, formulas, and applicability of this calculation have been reviewed for the specific design context. PE-Calc tools provide computational support only — the engineer is responsible for verifying results, applying engineering judgment, and complying with applicable codes and standards.