Georgia dam safety

Does My Dam Need an Emergency Action Plan in Georgia?

By Michael Flynn, PE · water resources & dam safety engineer

The obligation, who it falls on, and the recurring duty that follows it — from O.C.G.A. §§ 12-5-370 et seq. and Ga. Comp. R. & Regs. 391-3-8 (Rules for Dam Safety).

Answer

Category I dam owners must develop and submit an emergency action plan to the Division for approval, in the Division-approved format (391-3-8-.11).

Because only Category I dams are regulated in Georgia, the EAP question and the "is my dam regulated" question have the same answer.

Timing

Inspections, which travel with the same obligation

Georgia inspection schedule — 391-3-8-.10(2)
WhoFrequencyNotes
Dam owner (no engineer required)Each calendar quarter
EngineerAt least every two yearsConducted between 1 October and 31 March
ReportingBy 30 AprilFor inspections in the preceding 1 April–31 March window

Dams under 50 feet may request a one-cycle waiver of the two-year engineer inspection where four consecutive quarterly inspections show no deficiencies and there have been no recent enforcement actions. The waiver is one cycle, not a standing exemption.

Georgia in the national picture

Georgia has 556 high-hazard dams, of which 60 (10.8%) have no emergency action plan recorded in the National Inventory of Dams. Rankings, method and the downloadable dataset are on the national EAP gap page.

Am I in scope? →
The classification that triggers this
Dam Breach Peak Discharge
Failure hydrograph for the inundation map
Reservoir Routing
Route the breach downstream

Scope. General information about Georgia dam safety regulation, read from primary sources and current as of 2026-08-28. Not an engineering opinion about any specific structure and not legal advice. Requirements change when the legislature amends the Georgia Safe Dams Act of 1978 or the rules are revised — confirm against the current text of O.C.G.A. §§ 12-5-370 et seq. and Ga. Comp. R. & Regs. 391-3-8 (Rules for Dam Safety), and contact the Georgia Environmental Protection Division for a determination that binds.

Monthly engineering case studies

One real stormwater, dam, or hydraulics design problem per month, with the math worked out and the gotchas called out. No tutorials, no fluff.

Free. Unsubscribe anytime. Privacy.